The Steering Committee for the Northwest Highway Urban Design Study was informed on 12/08/99 by Chief Planner Peer Chacko that our TxDOT request for $1.28 million was not approved for STEP grant funding.
This request included funding for trees, shrubs, planting, irrigation, median work, sign toppers, bridge painting (Denton overpass), ramp construction for our pedestrian bridge, etc. This is almost half of the total financial need for our Urban Design Study.
We were told that we still have an opportunity to make a presentation at the Commissioners meeting in Austin on December 15th for final-round funding.
The City of Dallas has a lobbyist in Austin who will assist us with our secondary request.
Any information you have that might help us will be very much appreciated. Please email Linda Neel at LinNeel@aol.com.
Watch for updates.
By Linda Neel
This request included funding for trees, shrubs, planting, irrigation, median work, sign toppers, bridge painting (Denton overpass), ramp construction for our pedestrian bridge, etc. This is almost half of the total financial need for our Urban Design Study.
We were told that we still have an opportunity to make a presentation at the Commissioners meeting in Austin on December 15th for final-round funding.
The City of Dallas has a lobbyist in Austin who will assist us with our secondary request.