Canyon North is getting two streets resurfaced. Westlake Drive is being completely demolished and replaced. The trees that caused the damage to the road have been removed. The street will remain a one way passage. The fence is owned by Ski Island and they will most likely be replacing it with something other than the pipe and rail fence that was there. The other street that is being repaired is Evergreen Canyon from Basswood to Westlake Drive. It will be milled down and a new surface put on top. These repairs will occur during the summer of 2007. If you have any questions regarding the repair of these two streets, please contact Becky Rickard at brickard@cox.net.