WHAT IS THE PURPOSE OF THE COMMITTEE?
The purpose of the Committee is to maintain property values by protecting the environmental and architectural integrity of the Subdivision in accordance with the provisions of the Declaration of Covenants, Conditions and Restrictions (CC&Rs). The CC&Rs state that no building, structure or improvement of any character shall be erected, placed, added to or altered on any lot until the building plans, specifications and a site plan showing the location of the proposed structure or structures have been submitted to and approved by Architectural Control Committee for the Association as being in compliance with the restrictions as to use, quality of workmanship and materials, nature of materials, harmony of external design and colors with existing and proposed structures, and location of improvements with respect to topography, finished grade elevation, lot boundary lines and building lines, and within the scheme and design of Declarant.
WHAT ACTION IS REQUIRED OF OWNER (S)?
Prior to making any change or improvement, any owner planning to change or add to the existing structures on a lot must submit a request in writing to the ACC stating the details of the intended change, improvement or need for variance and attaching samples or plans to more clearly describe the projected change or addition. If any change, improvement or action in variance from the CC&Rs is taken prior to written approval of the ACC, the Association has the right to require the homeowner to remove the improvement(s) and/or change(s) from the property.
WHAT TYPES OF ITEMS REQUIRE WRITTEN APPROVAL?
Some examples of improvement/alterations requiring written approval from the ACC include (refer to the CC&Rs for other details):
§ Painting
§ Fence replacement
§ Buildings/Structures (Pools, Storage Buildings, Patio Covers, Play Structures, etc.)
§ Other (Flagpoles, light fixtures, etc.)
Essentially any type of project that may change the appearance of the property.
CAN THE COMMITTEE GRANT VARIANCES FOR CERTAIN DETAILS?
The Committee is authorized to grant selective variances for things such as location, height, number of improvements, materials, etc., but the owner must request this variance, giving reasons why it should be granted so that the Committee can make a reasoned decision.
WHY DO WE HAVE TO PUT EVERYTHING IN WRITING?
The formal request and approval process is necessary to assure that every owner’s desire to improve his or her property can be given due process without discrimination. It will also provide the owner(s), the Committee and the Association Board with a permanent record of actions taken under the CC&Rs.
WHAT DO WE NEED TO SAY IN THE REQUEST?
A number of owners have already requested and been granted approval to add improvements to their property by following the procedures outlined in the CC&Rs, but there are some owners who have expressed surprise and consternation about having to “ask permission” to improve their own property. Your subdivision was developed and made subject to the CC&Rs and all owners become obligated to follow the terms of the CC&Rs when they receive the deed to their property. A form has been created to make it easier for all owners to submit requests for improvements. Contact Wildwood Management Group or visit their website at www.wildwood-sa.com to obtain a form and assistance.
Wildwood Management Group
2611 N. Main
San Antonio, TX 78212
210.732.0000
210.733.3415 fax
www.wildwood-sa.com