Hi, What are the plans for working on the path that connects with the W&OD?
The connection to the trail from Lawyers Rd in Vienna is blocked by a
deep muddy patch. And, the small wooden ramp at the bridge on the
wooden walkway from Meadow Knoll Ct. has dropped several inches
preventing riding up to the bridge
Perhaps a simple solution of gravel or wood chips and/or concrete block stepping
stones would allow us to get to the trail through the muddy section.
For the ramp at the bridge, perhaps a small concrete ramp on both sides
of the bridge will be longer lasting.