It looks like the finishing touches are being done on the improvements to our street (paving, sidewalks, curbs). I think it looks nice except for the fact that with our last rain the portions of driveways that they tore up to install the sidewalks did a lot of sinking. Does anyone know if they plan to regravel those areas? My work schedule conflicts with the meetings so am not sure if this item was covered or not. Thanks!