Siding on the backside of the 215 is now complete.
Front and back enrty doors on 215 have been installed including electonic locks. The interior and exterior of the doors and trim will be painted within the next few months- when the temperature is approptiate for painting.
The heat registeres in the 215 will be sanded and painted soon.
Gutters on all buidings and garages have been cleaned out and neccesary repairs to them have been made.
Motion light on the 219 garage, and dumsper area have been installed and are functioning. This is for greater saftey and to see the dark dumsper area at night.
A light has been installed on the backside corner of the 219 building for added saftey.
Powerwashing and disinfecting of the siding on the 219 building and garages has been completed, as well as the dumpster area. Other buidings will follow as needed.