The project providing sidewalks and blacktop walks from the Strohecker?’s parking lot uphill to Humphrey Boulevard was completed with the installation of wrought iron fencing in areas where the hill drops off from the walk. The
walkway is a combination of concrete sidewalk and blacktop striped similar to bicycle pathways.
The pedestrian crosswalk project at the intersection of Patton Road, Humphrey Boulevard, Greenway, Dosch and Talbot also has been completed. The project reduced some of the danger to people crossing those streets. The project also facilitated traffic flow by providing space for autos waiting to turn down Dosch Road without obstructing traffic flow south on Patton Road