Architectural Change Request
Mail To: Summit View Meadows HOA Or E-mail: summitviewmeadows@hotmail.com
P.O. Box 4051
Grand Junction, CO 81502
Date Submitted:______________________ Proposed Project Start Date:__________________
Your Name & Address:__________________________________________________________
Phone:_____________________________ E-mail:____________________________________
Type of Project:________________________(structure, fence, landscape, or color change/painting)
Structures:
Submit a basic diagram or drawing of the proposed structure to be added with dimensions and scale, including the proposed height of the structure.
Proposed location on the property:______________________________________________
Setback distance (consult City Planning Department for setback requirements):_________
Description of materials to be used and color:______________________________________
Other Comments/Specifics:_____________________________________________________
________________________________________________________________________________
Fences/Landscaping:
Submit a drawing with height and location of proposed fencing, trees, and major landscaping and
hardscaping on the property.
Description of materials/plants to be used:___________________________________________
_________________________________________________________________________________
Color Change/Painting:
Submit a paint chip (minimum 2” square) of the proposed color to be used.
Description of what will be painted/resurfaced:________________________________________
________________________________________________________________________________
All major architectural changes must be approved by the SVMHOA Board/Architectural Committee before commencement to avoid fines. Send the above form to the SVMHOA Board of Directors/Architectural Committee at the above postal mail address or by e-mail to the e-mail address. The Committee has up to 15 days to approve or disapprove the plans. All improvements must be in line with City Codes.
I have read and understand the conditions and regulations of the Architectural Committee set forth
in the CC&Rs and the Architectural Control Policy for Summit View Meadows HOA. I further understand that up to 15 days may be required for approval once the plans are submitted.
Homeowner Signature:________________________________________ Date:_______________