Randy (Schnabel Engineering) 770-781-8008, met with the hospital/developer a couple of weeks ago. He said that flood studies down stream are being done now so that a decision could be made regarding the water level for the lake.
Then a decision will be made regarding the design. The design decision then goes to the state for approval.
This still sounds like a long time frame...stay tuned.
Then a decision will be made regarding the design. The design decision then goes to the state for approval.
This still sounds like a long time frame...stay tuned.